Fit4Purpose

 

We can support our clients throughout the entire project – starting at the first sketch until completion.

 

Before designing a laboratory we first look at the analyses to be performed. This means we begin at the start.

 

How does the analytical schedule look like, how many samples are being taken, which analyses take place, which equipment is required? How does the end-user feel about this?

 

After going through these steps we establish a logical grouping of equipment. This eventually gives us a layout of the entire building. Gas shelter, water lab, chemical storage areas and walking routes for the lab technicians are carefully implemented.

 

In 3D as drawing but also interactive which is unique in the market. This prevents unnecessary costs and contributes to our FIT4PURPOSE approach.