Why do you use Revit for 3D laboratory design?

Revit Building Information Model (BIM) Software

Revit

Revit is BIM software that integrates all architectural, engineering and construction disciplines into a single modelling environment. This results in more efficient and cost-effective projects.

What are the benefits?

The type of software used depends on many factors. Reasons for using one are features, in company knowledge of products, costs, and software used by suppliers/clients.

Revit is quite popular and often used in the Building Information Modelling process. This is mainly because of the advantages:

  • Parametric modelling
  • No repetitions
  • Landscape designs
  • Energy Efficient Design
  • No paper documentation
  • Huge Library
  • Automation
  • Collaboration
  • Coordination
  • Scheduling

How compatible are the different Revit versions with each other?

Revit is not backwards compatible. Meaning, files saved in a newer version can not be read in older versions. This is applicable on year level (e.g 2021.1 to 2020.2), not on versions within a year (e.g. 2021.2 to 2021.1).

What are alternatives?

How can we help you?

Let us get acquainted and talk about your challenges, looking for the best possible solution for you and your company!

We can help you with consultancy, project management and turn-key laboratory projects.

Labs31 Team

More Frequently Asked Questions

Laboratory rent or build?

You can't just set up a laboratory anywhere. This is resticted to quite some laws and regulations. Depending on the actual situation of your company  there are several possibilities. The ...

Which are the important characteristics of a good fume cupboard?

The fume cupboard (FC) or fumehood protect users from getting into contact with potentially dangerous chemicals and should discharge them outside the building. These cabinets ensure that exposure to hazardous, ...

What are the key considerations for laboratory furnishing?

In laboratory furnishing, it is important that every meter is used optimally, in order to create an effective laboratory. When setting up your lab, it is important that every choice ...

What are Safety Regulations for a laboratory?

Safety regulations have different sources. For this reason, it is hard to define what the specific safety regulations are. What are different sources for  Safety Regulations? Company instructions Local (e.g., ...

What is Building Information Modeling (BIM)?

Building Information Modeling (BIM) is the integrated process of creating and managing information for a built environment. It is the foundation of a digital transformation in the architecture, engineering, and ...

Are utilities part of your Laboratory design?

This depends on your needs and those of the client. Utilities like gas, water, power supply, data and HVAC can be part of your laboratory design. In most cases, these matters ...
Scroll to Top